Geotechnical Specialist Consulting Firm

SOIL INVESTIGATION NEW FEEDER BREAKER & SKYLINE CONVEYOR 1000TPH – PT MUARA ALAM SEJAHTERA – 2022

To develop mining activities, PT. Muara Alam Sejahtera (PT. MAS) performs the work of New Feeder Breaker & Skyline Conveyor located in the area of PT. Muara Alam Sejahtera, Lahat Regency, South Sumatra Province. The purpose of this study is to conduct analysis related to geotechnical conditions in the form of analysis of global stability and foundations and provide technical recommendations related to geotechnical problems in the work of New Feeder Breaker & Skyline Conveyor.

 

JASA PENYELIDIKAN TANAH FONDASI TANGKI BOTTOM PRODUCT – PT KILANG PERTAMINA INTERNASIONAL RU III PLAJU – 2022

Soil investigation located in the area of PT. Pertamina RU III, Plaju City, South Sumatra Province aims to conduct a soil investigation survey in the Green Refinery Area of the RU III Plaju Refinery, laboratory testing, and geotechnical analysis in the form of soil carrying capacity and foundation and its potential decline.

We conducted laboratory testing with 24 to 6 drilling points, Twelve (12) sondir test points or cone penetration test (CPT) capacity of 2.5 tons, and Six (6) deep drill points and a Standard Penetration Test (SPT) interval of 2m with a drill depth of 60m with the taking of 4 uninterrupted samples (UDS) per point.

 

SOIL INVESTIGATION AT SUATO TATAKAN – PT. ANTANG GUNUNG MERATUS (AGM) – 2022

Soil investigation  located at Jalan Ahmad Yani KM 101, Suato Tatakan, South Tapin, Tapin Regency, South Kalimantan. Based on the results of internal discussions of PT AGM, additional data is needed to be able to support design needs in the form of two (2) drilling points accompanied by laboratory testing in the form of swelling and mineralogy testing.

 

SOIL INVESTIGATION AT PLAJU – PT LAPI ITB – PT. PERTAMINA RU III PLAJU – 2021

Soil testing is located in the area of PT. Pertamina RU III, Plaju City, South Sumatra Province. The purpose of this study is to design the widening of the JAT pump foundation 2210 for the motor addition plan and conduct an assessment for the constructability of this foundation construction so that it can be done properly without disturbing the existing foundation and structures around it.